Research and risk management of the Mintec tailings pond
The purpose of the project is to plan and implement the sampling of Mintec’s tailings pond to determine the fiber content of the material. The samples are sent to Finnis…
The purpose of the project is to plan and implement the sampling of Mintec’s tailings pond to determine the fiber content of the material. The samples are sent to Finnis…
…for the clean transition and circular economy. “GTK Mintec’s specialist, research and laboratory services complement well Metso’s own research and laboratory services. Our ambition is to provide our customers around…
…GTK Mintec mineral processing laboratory, Outokumpu (Fig. 1). Spectra were collected using the 532 nm laser at room temperature in backscattering geometry with a laser power of about 5 mW…
SMARTT aims at developing the current GTK Mintec tailings facility into an instrumented Smart Tailings Facility with increased capacity for future operations. At the same time, new approaches and products…
…were done in cooperation with companies. The cornerstone of GTK Mintec’s new office and laboratory building was set in the autumn of 2022. We are developing GTK Mintec into one…
…
The aim is to procure new flotation cells to the pilot plant at GTK Mintec in Outokumpu. The new flotation cells are part of a modernization and expansion of the…